节点文献
水电站机电设备重大件运输问题探讨
Transportation of Heavy and Large Parts for Mechanical and Electrical Equipments of Hydropower Stations
【摘要】 针对我国大型水电站分布情况,分析了水电站机电设备重大件的运输问题。详细阐述了水电站水轮机转轮、主变压器、桥机大梁及其他机电设备运输中的难题,并提出了相应的解决措施及建议。
【Abstract】 The distribution of large-scale hydropower stations in China will lead to difficult transportation of heavy and large parts of mechanical and electrical equipment.The problems on transporting turbine runner,main transformer,bridge crane’s girder and other mechanical and electrical equipments are analyzed and the solutions and recommendations are also proposed herein.
【关键词】 运输;
重大件;
机电设备;
水电站;
【Key words】 transportation; heavy and large part; mechanical and electrical equipment; hydropower station;
【Key words】 transportation; heavy and large part; mechanical and electrical equipment; hydropower station;
- 【文献出处】 水力发电 ,Water Power , 编辑部邮箱 ,2011年10期
- 【分类号】TV53;U11
- 【被引频次】7