节点文献
中国混凝土面板堆石坝的发展
Development of Concrete Faced Rockfill Dam in China
【摘要】 2010年是我国引进现代筑坝技术建设混凝土面板堆石坝的第25年。面板堆石坝经过了"引进消化、自主创新、突破发展"三个阶段。通过不断总结经验教训,我国在面板堆石坝设计、施工、科研、监测和特殊条件下建坝等方面取得了瞩目的成就,建立了较为完备的具有自身特色的技术标准体系和工业化体系,如今我国面板堆石坝数量多,最大坝高、工程规模和技术难度都处于世界前列。筑坝技术正在向更高更难方向发展。
【Abstract】 The Year 2010 is the 25th year of constructing concrete faced rockfill dams in China.After experiencing three development stages of Introduction and Assimilation,Innovation in Our Own Hands and Breakthrough and Development,the noteworthy achievements are gained on CFRDs’ design,construction,research and monitor and constructing CFRDs on specific natural conditions.The complete technical standard system and industrial system are also established for the development of CFRDs.The number,maximum height,engineering scale and technology of CFRD has leapt into the front ranks of the world.The construction technology of CFRD is marching to a higher level in China.
【Key words】 concrete faced rockfill dam; development; stage; achievement; trend;
- 【文献出处】 水力发电 ,Water Power , 编辑部邮箱 ,2011年02期
- 【分类号】TV641.43
- 【被引频次】121
- 【下载频次】2089