龙凤水电站坝基河床强夯试验研究
Experimental study on heavy tamping of riverbed for dam foundation of Longfeng Hydropower Station
【摘要】 龙凤水电站坝基位于砂卵石层上,其覆盖层强度不满足设计要求。为节约工程费用,拟对其河床砂卵石坝基采用强夯措施来改善其工程特性。为验证设计指标并确定施工参数和质量控制标准,在现场进行了强夯试验研究。
【Abstract】 As the foundation for the dam of Longfeng Hydropower Station is just located on a sandy gravel stratum,the strength of its coverage cannot meet the requirement of the design.For saving the relevant construction cost,the foundation treatment measure of heavy tamping is planned to be adopted to improve the engineering characteristics therein;for which an experimental study is made in situ,so as to verify the design indexes and determine both the construction parameters and the quality control standards concerned.
【关键词】 坝基处理;
砂卵石基础;
强夯试验;
龙凤水电站;
【Key words】 dam foundation treatment; sandy gravel foundation; heavy tamping experiment; Longfeng Hydropower Station;
【Key words】 dam foundation treatment; sandy gravel foundation; heavy tamping experiment; Longfeng Hydropower Station;
- 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,2011年11期
- 【分类号】TV551.4
- 【被引频次】3
- 【下载频次】40