Objective To evaluate the risk factors,degree and type of possible occupational hazard for new activated carbon project in an enterprise,to assess the feasibility of construction for the project design and to provide the necessary protection measures of occupational hazards.Methods The risk factors were detected by analogy,on-site health investigation and checklist method,and combined with relevant technical information to analyze occupational hazards.Results The main risk factors were as followed: carbon m...