节点文献

刘庄矿主井井塔设计

Comments on Design of Main Shaft Headframe in Liuzhaung Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 周家英朱晓辉柯文改

【Author】 ZHOU Jia-ying,ZHU Xiao-hui,KE Wen-gai (Hefei Design and Research Institute of Coal Industry,Hefei 230041,China)

【机构】 煤炭工业合肥设计研究院

【摘要】 文章根据刘庄矿主井井塔具体工程特点,从井塔结构设计、地基处理及基础设计对井塔的设计进行了阐述。特别是刘庄主井井塔首次在人工快速解冻冻融土地基上建设,填补了我国乃至世界人工快速解冻冻融土工程建设的空白,并在人工快速解决冻融土地基上采用了桩基后压浆技术,为以后在人工快速解冻的冻融土地基上的工程建设提供了设计参数和经验。

【Abstract】 According to the certain engineering features of the mine main shaft headframe in Liuzhuang Mine,from the headframe structure design,foundation treatment and foundation design,the paper had a statement on the design of the headframe.Especially the mine shaft headframe of Liuzhuang Mine was firstly established on the foundation of the artificial rapidly defrosted thawing soil and the back pressurized grouting technology was applied to the pile foundation of the artificial rapid defrosted thawing soil foundation.All those had provided the design parameters and experiences to the engineering constructions on the foundations of the artificial rapid defrosted thawing soil.

  • 【分类号】TD541
  • 【被引频次】11
  • 【下载频次】101
节点文献中: 

本文链接的文献网络图示:

本文的引文网络