立井施工新型吊盘稳盘装置的研制与应用
Development and Application of New Stabilization Device to Shaft Sinking stage for Mine Shaft Construction
【摘要】 立井井筒施工,吊盘是必不可少的施工设施,吊盘的稳定与否对施工安全至关重要。文章介绍了两种传统吊盘稳盘装置在使用过程中存在的问题,针对存在的问题,设计了一种新型吊盘稳盘装置。重点介绍了新型吊盘稳盘装置的结构、工作原理和使用性能。
【Abstract】 In the mine shaft construction,a shaft sinking stage would be a necessary construction facility and the stabilization of the sinking stage would be critical important to the construction safety.The paper introduced the problems existed in the operation process of two conventional stabilization devices for the sinking stages.According to the existed problems,a new stabilization device of the sinking stage was designed.The paper in detail introduced the structure,working principle and operation performances of the new stage stabilization device.
【关键词】 立井施工;
新型吊盘;
稳盘装置;
【Key words】 mine shaft constriction; new sinking stage; stage stabilization device;
【Key words】 mine shaft constriction; new sinking stage; stage stabilization device;
- 【文献出处】 煤炭工程 ,Coal Engineering , 编辑部邮箱 ,2011年05期
- 【分类号】TD262.3
- 【被引频次】7
- 【下载频次】81