To minimize the maximum makespan of PFSP,this paper proposed a two-stage scheduling algorithm based on EDA.In the first stage,the algorithm generated a local optimal solution of PFSP with EDA.In the second stage,to enhance the quality of the local optimal solution,it employed a new hybrid neighborhood search strategy.Finally,the simulation results and comparisons based on benchmarks validate the efficiency of the proposed algorithm.
Two-stage algorithm based on estimation of distribution algorithm forpermutation flow-shop scheduling problemYE Bao-lin1,GAO Hui-min2a,WANG Xiao-ping2b,3,ZENG Jian-chao10引言流水车间调度问题(flow-shop scheduling problem,FSP)是组合优化中研究得最为深入的问?