节点文献
新产品开发多项目协同计划与资源冲突的动态再匹配实现方法
Dynamic re-matching for conflict between resource and multi-project collaboration plan of new product development
【摘要】 在有供应商参与的大批量制造企业多项目协同计划的执行过程中,可能会出现的资源颗粒或项目任务的变更,导致广义设计资源颗粒与多项目计划任务匹配出现的冲突,使原协同计划无法继续进行。针对这一问题,提出了在原协同计划执行过程中进行多项目计划与广义设计资源的动态再匹配的思想,建立了各种变更情况下的动态再匹配的模型及算法,以保证已启动的新产品开发多项目计划能顺利执行。用一实例对所建模型和动态再匹配算法进行了验证,证明所提出的方法是可行的。
【Abstract】 Alteration of resource granule or project tasks may occur in the implementation of multi-project collaboration in high-volume manufacturing including involvement of suppliers which lead to conflict between matching for generalized design resource granule and multi-project plan task and makes the original collaboration plan cannot proceed.To solve this problem and in order to ensure the started multi-project plan of new product can implement smoothly,proposed a idea of dynamic re-matching for multi-project plan and generalized design resource in the original implementation of collaboration plan.Presented model and algorithm of dynamic re-matching under variety changes.The model and the dynamic re-matching algorithm is validated using an example which proved the proposed method is feasible.
【Key words】 alteration of plan and resource; re-matching model of plan and resource; implementation algorithm of dynamic re-matching;
- 【文献出处】 计算机应用研究 ,Application Research of Computers , 编辑部邮箱 ,2011年08期
- 【分类号】F224;F273.1
- 【被引频次】7
- 【下载频次】168