节点文献
核电站风险监测系统恢复分析方法及其应用
A recovery method for nuclear power plant risk monitor and its application
【摘要】 核电站概率安全评价中一般都包含恢复分析的内容,作为概率安全评价技术高级应用的风险监测系统同样也需要恢复分析。在分析风险监测系统实时风险计算特点及要求的基础上,总结了风险监测系统恢复分析特点,并以秦山三核风险监测系统恢复分析为例进行详细介绍。研究给出一般性指导原则,并为核电站概率安全评价模型的建立提供了参考建议。
【Abstract】 Recovery analysis is usually contained by nuclear power plant’s probabilistic safety assessment(PSA).As an advanced application of PSA,risk monitor also needs to perform recovery analysis.Based on the analysis for characteristics and requirements of risk monitor real-time risk calculating,specialties of risk monitor recovery analysis were summarized,and Third Qinshan Nuclear Power Plant Risk Monitor recovery analysis was introduced in detail.This study gives general guidelines and proposals for the development process of nuclear power plant PSA model.
【Key words】 risk monitor; probabilistic safety assessment; recovery analysis;
- 【文献出处】 核科学与工程 ,Chinese Journal of Nuclear Science and Engineering , 编辑部邮箱 ,2011年03期
- 【分类号】TM623.8
- 【被引频次】4
- 【下载频次】199