邯钢3200m~3高炉开炉达产实践
Practice of Blowing in and Arrival at Full Capacity of 3200m~3 Blast Furnace in Hansteel
【摘要】 通过制定合理的烘炉和开炉方案,确定适宜的开炉工作参数,加强高炉操作调剂等措施,邯钢3 200 m3高炉实现了开炉快速达产。
【Abstract】 Through establishing reasonable dry-machine and blow-in program,and determining appropriate operating parameters for blow-in,strengthening the furnace blast furnace operation adjustment measures,Handan iron and steel company 3 200 m3 blast furnace to achieved a quick arrival at full capacity.
【关键词】 大型高炉;
开炉方案;
达产;
【Key words】 large sized blast furnace; blow-in plan; arrival at full capacity;