节点文献

台山电厂烟气换热器结垢堵塞的运行分析

Operational Analysis on Scaling and Blocking in GGH of Taishan Power Plant

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘海滨庄文军余鹏高小春

【Author】 LIU Hai-bin,ZHUANG Wen-jun,YU Peng,GAO Xiao-chun(Shenhua Guangdong Guohua Yuedian Taishan Power Generation Co.,Ltd,Taishan,Guangdong 529228,China)

【机构】 神华广东国华粤电台山发电有限公司

【摘要】 对造成烟气换热器(gas gas heater,GGH)结垢堵塞的根本原因——烟气携带石膏、除雾效果不佳、吹扫不足、煤种和石灰石品质下降等因素进行了具体分析,提出针对性的改进措施:对GGH设备进行改造,加装导流板;对机组进行运行调整。整改后,GGH结垢堵塞和差压升高的问题得到缓解。

【Abstract】 Fundamental reasons for scaling and blocking in gas-gas heater(GGH),such as gas with gypsum,poor defogging effect,insufficient purge,degradation of coal type and limestone quality and other factors are concretely analyzed,and targeted improvement approaches are proposed: redevelop the GGH equipment by installing deflector and carry on operation adjustment.After the improvement,problems concerning scaling and blocking in GGH and rise of differential pressure get relieved.

【关键词】 烟气换热器增压风机结垢堵塞吹扫方式
【Key words】 gas-gas heaterbooster fanscalingblockingpurge mode
  • 【文献出处】 广东电力 ,Guangdong Electric Power , 编辑部邮箱 ,2011年01期
  • 【分类号】X701.3
  • 【被引频次】1
  • 【下载频次】106
节点文献中: 

本文链接的文献网络图示:

本文的引文网络