Dynamic optimization of cutoff grade in underground metal mining

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 顾晓薇王青初道忠张斌

【Author】 GU Xiao-wei, WANG Qing, CHU Dao-zhong, ZHANG Bin College of Resource and Civil Engineering, No rtheastern University, Shenyang 110004, China

【机构】 College of Resource and Civil Engineering, Northeastern University(Shenyang)

【摘要】 In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.

【Abstract】 In order to maximize the overall economic gain from a metal mine operation, selection of cutoff grades must consider two important aspects: the time value of money and the spatial variation of the grade distribution in the deposit. That is, cutoff grade selection must be dynamic with respect to both time and space. A newly developed method that fulfills these requirements is presented. In this method, the deposit or a portion of it under study is divided into "decision units" based on the mining method and sample data. The statistical grade distribution and the grade-tonnage relationship of each decision unit are then computed based on the samples falling in the unit. Each decision unit with its grade-tonnage relationship is considered as a stage in a dynamic programming scheme and the problem is solved by applying a forward dynamic programming based algorithm with an objective function of maximizing the overall net present value (NPV). A software package is developed for the method and applied to an underground copper mine in Africa.

【基金】 Project(50974041) supported by the National Natural Science Foundation of China; Project(20090450112) supported by the Postdoctoral Foundation of China;Project(20093910) supported by the Natural Science Foundation of Liaoning Province, China
  • 【文献出处】 Journal of Central South University of Technology ,中南大学学报(英文版) , 编辑部邮箱 ,2010年03期
  • 【分类号】P618.2
  • 【被引频次】5
  • 【下载频次】122
节点文献中: 

本文链接的文献网络图示:

本文的引文网络