节点文献
葛洲坝电站非汛期日优化发电计划编制方法初步研究
Optimal Daily Operation in Gezhouba Hydroelectric Plant in Non-flood Season Based on Precisely Simulating and Genetic Algorithms Improved by Simulated Annealing
【摘要】 以水电厂机组为单元建立了葛洲坝电站的发电模拟模块,据此采用经模拟退火算法改进的混合遗传算法,建立葛洲坝电站非汛期厂内日优化发电调度模型,并将其应用到葛洲坝电站发电计划编制工作中,实现枯水期厂内发电流量的优化分配.采用2007年4月1日至4月10日实际资料对该模型进行验证与校核,结果表明模型模拟单日平均出力的精度达98.84%.经优化10日最多可新增电量1270×104kW.h.
【Abstract】 A new method was presented to make daily operation scheme for Gezhouba Hydropower Plant in non-flood season.This method couples a hybrid genetic algorithm improved by simulated annealing with a precisely simulating model which is able to simulate the power generation process to the extent of each unit.By this method,the optimal allocation of the flow among the available power units are achieved successfully.Using the historical data from April 1 to April 10,2007 to verified this method,results showed that the simulation accuracy of average daily output of power plant was 98.84%,and by optimization the maximum 10 days’ increased electricity output was up to 12.7×104kW·h.
【Key words】 Gezhouba Hydropower Plant; hybrid genetic algorithm; simulated annealing; optimal operation;
- 【文献出处】 应用基础与工程科学学报 ,Journal of Basic Science and Engineering , 编辑部邮箱 ,2010年03期
- 【分类号】TV737
- 【被引频次】15