节点文献
公路铁路工程水土保持准入条件
Permitted requirements of soil and water conservation for highway and railway projects
【摘要】 公路铁路工程均为建设类线型工程,与其他开发建设项目相比,具有战线长、跨越地貌类型多、占地面积多且多为永久占地、动用土石方工程量大、沿线取(弃)土场多的建设特点。通过对照法律、法规、标准、规划等相关资料,提出公路铁路工程项目共用的水土保持准入条件4条、公路铁路工程项目分别采用的水土保持特殊准入条件各1条,公路铁路共用限批条件3条、公路特殊的限批条件1条,水土保持方案须修正主体工程设计后再报批条件4条、须修改完善水土保持方案后再报批条件3条,并提出水土保持优先审批、暂缓审批的10条建议。
【Abstract】 Highway projects and railway projects are all the linear engineering.Compared with other construction projects,their characteristics are long front,across many different kinds of terrain,covering more and more permanent occupied area,using of a large quantity of earth and stone works,lots of spoil ground and earth cutting sites along the route and so on.According to the laws,regulations,standards,plans and other related materials,4 shared items of permitted requirements of soil and water conservation for highway and railway projects and each special item for highway projects and railway projects were put forward.Three shared items of restricted approval for highway and railway projects and each special item for highway projects and railway projects were put forward.Four items for revision of soil and water conservation for main building design plan,3 items for improvement of soil and water conservation plan,and 10 items for priority approval and delayed approval are put forward.
【Key words】 highway project; railway project; soil and water conservation; permitted requirement;
- 【文献出处】 中国水土保持科学 ,Science of Soil and Water Conservation , 编辑部邮箱 ,2010年03期
- 【分类号】U415.1;U215.1;S157
- 【被引频次】2
- 【下载频次】83