惠州抽水蓄能电站工程设计关键技术问题研究

Study on the Key Technology for the Design of Huizhou Pumped-Storage Power Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 廖建强陈云长

【Author】 Liao Jianqiang,Chen Yunchang(Guangdong Provincial Investigation Design and Research Institute of Water Conservancy and Electric Power,Guangzhou Guangdong 510635)

【机构】 广东省水利电力勘测设计研究院

【摘要】 惠州抽水蓄能电站工程勘测设计追求完美,力求创新,从工程选址、规模论证、库容选择,到地下工程的勘察设计,都具有独到之处。目前,该电站A厂4台机组及B厂5号机组已投运,工程设计思想已基本得到体现。该电站是国内单位千瓦投资最低的、首座周调节的抽水蓄能电站。

【Abstract】 The design of Huizhou Pumped-Storage Power Station has innovations on the site selection,scale demonstration,reservoir capacity selection and underground engineering design.The station has minimum investment on per kW installed capacity and is the first weekly-regulated pumped-storage power station in China.At present,four units in Plant A and the Unit 5 in the Plant B has been put into operation,the design is successful.

  • 【分类号】TV743
  • 【被引频次】2
  • 【下载频次】112