通过漫坝风险管理提高水利枢纽发电效益

Increase Hydroelectric Generation by Overtopping Risk Management

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 孙颖由丽华腾莉梅李其军

【Author】 Sun Ying1,You Lihua2,Teng Limei3,Li Qijun4(1.North China Electric Power University,Beijing 102206;2.Sichuan Zipingpu Development Co.,Ltd.,Dujiangyan Sichuan 611830;3.SINOPEC Engineering Corporation,Beijing 100101;4.Beijing Hydraulic Research Institute,Beijing 100044)

【机构】 华北电力大学工商管理学院四川紫坪铺开发有限责任公司中国石化工程建设公司北京市水利科学研究所

【摘要】 运用漫坝风险分析理论,对紫坪铺水利枢纽漫坝风险进行了分析、计算,在确保水库漫坝风险小于10-6的前提下,提出汛限水位动态控制的建议。最终把汛限水位从850m抬高到855m,将使其多年平均发电量增加约1亿kW.h,从而提高了发电效益。

【Abstract】 The overtopping risk of Zipingpu Hydropower Project is calculated according to the theory of overtopping risk analysis.Under the assurance of dam safety reliability is higher than 99.999999%,the dynamic flood control level is suggested.The final flood control level is raised to 855.0 m from 850 m,so the annual average generation will increase by about 100 GW.h.

  • 【分类号】TV697.13
  • 【被引频次】2
  • 【下载频次】75
节点文献中: 

本文链接的文献网络图示:

本文的引文网络