狮岭高架桥改建结构选型及设计探讨
Discussion of Structure Selection and Design of the Reconstruction of Shiling Viaduct
【摘要】 针对狮岭高架桥扩建期间不能中断交通的要求,综合考虑施工阶段交通流的转换、施工工艺、原路基利用率、工程造价等因素的影响,通过方案比选,确定最优的上、下构方案。
【Abstract】 Since the traffic can not be interrupted during the expansion of Shiling viaduct,considering the conversion of traffic flow,construction technology,original roadbed utilization,project cost and other comprehensive factors in the construction phase,through the plan comparison,the paper determined the optimal upper and lower component plan.
- 【文献出处】 交通科技 ,Transportation Science & Technology , 编辑部邮箱 ,2010年06期
- 【分类号】U448.28
- 【下载频次】20