节点文献

深厚覆盖层条件下高拱坝坝身泄洪消能的布置方式研究

Study on the layout of flood discharge and energy dissipation of high arch dam within deep overburden layers

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 孙双科柳海涛徐体兵

【Author】 SUN Shuangke,LIU Haitao,XU Tibing (China Institute of Water Resources and Hydropower Research,Beijing 100038)

【机构】 中国水利水电科学研究院水力学研究所

【摘要】 本文以某大型高拱坝工程为例,研究了深厚覆盖层条件下高拱坝坝身泄洪消能的布置方式,提出了以"护坡不护底、不设二道坝、部分预挖覆盖层"取代传统的"水垫塘+二道坝"泄洪消能布置方案的设想,并进行了水工模型试验研究,初步论证了上述方案的可行性。本文的研究成果可供国内类似工程参考。

【Abstract】 This paper investigates the layout scheme of flood release works and energy dissipation of high arch dams within deep overburden layers through scale-model tests conducted for a practical large-size high dam as a study case. By the new scheme proposed in this paper,only the slopes need be protected by lining technique,while the protection of scour pool bottom and the secondary dam that are adopted traditionally,are eliminated. The feasibility of this new idea is verified by the results of our model tests,which provides a reference to the design of similar dams in China.

【基金】 国家自然科学基金项目(No.50539060)
  • 【文献出处】 水力发电学报 ,Journal of Hydroelectric Engineering , 编辑部邮箱 ,2010年02期
  • 【分类号】TV653
  • 【被引频次】8
  • 【下载频次】217
节点文献中: 

本文链接的文献网络图示:

本文的引文网络