节点文献

挖孔桩在朝阳至黑水高速公路中的应用

Application of Excavation Pile in Chaoyang-Heishui Expressway

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张玉伟

【Author】 ZHANG Yu-wei

【机构】 辽宁省公路勘测设计公司

【摘要】 丹东至锡林浩特高速公路朝阳至黑水(辽蒙界)段,桥梁基础地层多属于较密实地层且地下水不发达,地质结构稳定,不易产生坍孔,特别适合采用人工挖孔。我们通过钻孔灌注桩和人工挖孔灌注桩的设计理论、施工工艺、工程造价的比较,在工程地质条件允许,优先考虑采用人工挖孔灌注桩方案,取得了良好的经济技术效益。

【Abstract】 The stratum of bridge foundations in Chaoyang-Heishui(boundary of Liaoning and Inner Mongolia) section of Dandong to Xilinhaote Expressway are mostly compact stratum with stable geologic framework and lacking of groundwater,which is not likely to produce hole collapse in construction and is suitable for manual excavation.After comparison of design theory,construction techniques and construction cost of cast-in-place pore pile and artificial excavated pore-pile,we found out that if the engineering geology conditions are suitable,artificial excavated pore-pile method will bring better economic benefits.

  • 【文献出处】 北方交通 ,Northern Communications , 编辑部邮箱 ,2010年02期
  • 【分类号】U445.551
  • 【下载频次】14
节点文献中: 

本文链接的文献网络图示:

本文的引文网络