节点文献

注水管柱下放摩阻计算

Friction Force Calculation of Water Injection String

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李治淼董峰刘巨保

【Author】 LI Zhi-miao,DONG Feng1,LIU Ju-bao(Daqing Petroleum Institute,Daqing 163318,P.R.China;No.2 Production Company of Daqing Oilfield Engineering Co.Ltd1,Daqing 163414,P.R.China)

【机构】 大庆石油学院大庆油田有限责任公司第二采油厂

【摘要】 注水管柱能否靠自重下放到井底是一个十分重要的技术问题。考虑管柱与井壁的初始间隙和随机接触摩擦阻力,建立了注水管柱力分析模型,采用"多向接触摩擦间隙元"理论对该模型进行了接触非线性力学分析。经大庆油田3口井的计算分析表明,注水管柱最大累计摩阻为0.74 kN,靠管柱自重完全可以下放到井底。

【Abstract】 It is a very important technical question whether water injection string can rely on string weight to go through the well hole or not.Considering the gap and random contact between the string and the well wall,the mechanics analysis model of water injection string is established and nonlinear mechanics analysis is done by using "gap element of multi-direction contact and friction" theory.The analyzed result of three wells in Daqing Oil Field shows that the maximum cumulative friction of is 0.74 kN.It means that water injection string can put under the bottom of well relying on string weight.

【基金】 国家自然科学基金(10672037)资助
  • 【文献出处】 科学技术与工程 ,Science Technology and Engineering , 编辑部邮箱 ,2010年07期
  • 【分类号】TE21
  • 【被引频次】3
  • 【下载频次】176
节点文献中: 

本文链接的文献网络图示:

本文的引文网络