节点文献
单周期ATO系统的交货期与价格决策模型
Decision model of delivery time and price in a single-period ATO system
【摘要】 交货期管理已经成为供应链管理研究的热点之一。针对价格和交货期相关需求下,含有两个组件的单周期ATO系统,首先考虑了由组件交货期不确定性对装配商带来的组件非一致性等待成本、组件提前交货的等待成本和产品延迟费用三种类型的提前期相关成本,然后建立了装配商的期望利润最大化的非线性规划模型,求出了最优的产品价格和承诺交货期,并对决策变量进行了敏感性分析,最后通过数值实验,研究了系统参数对装配商利润的影响。对订单装配企业交货期和价格决策具有一定的现实指导意义。
【Abstract】 Delivery time management has been a focus of supply chain management.This paper aims at a single-period assemble to order(ATO)system of price and delivery time demand,two components included.First,three delivery-time-related costs are analyzed: component inconsistent cost,components waiting cost for delivery in advance and product delay charges resulting from the uncertainty of component’s delivery time.Then,we build an assembler’s profit-maximization non-linear programming model,seek the optimal price and promised delivery time,and analyze the sensibilities of decision variables.Finally,numerical examples are introduced to study the effects of system parameters on the assembler’s profit.In reality,this research may guide the delivery time and price decisions of assemble-to-order enterprises.
【Key words】 assemble to order; delivery time; price; sensitive analysis;
- 【文献出处】 科技与管理 ,Science-Technology and Management , 编辑部邮箱 ,2010年03期
- 【分类号】F224;F274
- 【被引频次】6
- 【下载频次】157