节点文献

加速器联机装置运行状况

Accelerator-TEM interface facility and application

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘传胜黎明何俊杨铮周霖王泽松郭立平蒋昌忠杨世柏刘家瑞Lee J C付德君范湘军

【Author】 LIU Chuansheng~1 LI Ming~1 HE Jun~1 YANG Zheng~1 ZHOU Lin~1 WANG Zesong~1 GUO Liping~1 JIANG Changzhong~1 YANG Shibo~1 LIU Jiarui~2 Lee J C~3 FU DeJun~1 FAN Xiangjun~1 1(Accelerator Laboratory;Wuhan University,Wuhan 430072,China) 2(Texas Center for Superconductivity,University of Houston,TX,USA) 3(Quantum-Functional Semiconductor Research Center,Dongguk University,Seoul 100-715,Korea)

【机构】 武汉大学物理科学与技术学院加速器实验室Texas Center for Superconductivity University of HoustonQuantum-Functional Semiconductor Research Center Dongguk University

【摘要】 2008年武汉大学加速器联机系统初步建成,200 kV离子注入机至透射电镜束线进行了运行调试,开展了气体离子注入单晶Si、GaAs、Ag纳米晶和超临界反应堆材料(C276和6XN)的原位结构研究。结果表明,样品在注入至一定剂量时发生明显多晶和非晶化,单晶Si出现非晶化的临界剂量在1014 cm-2。C276材料经1×1015cm-2的Ar离子辐照后,产生尺寸3-12 nm的位错环,其密度随剂量提高而增大,至5×1015cm-2出现多晶,剂量超过3×1016 cm-2出现非晶化。在加速器-电镜联机光路上安装在线RBS靶室对离子束辐照材料进行元素成分和晶格定位测试。靠近电镜端安装50 kV低能离子源,开展核材料中氦泡形成过程的原位观测。对RBS/C装置进行数字化改造,用Labview控制系统运行,目前可进行计算机控制的背散射沟道测试。

【Abstract】 An accelerator-TEM interface facility has been established at Wuhan University in 2008.The system consists of an H800 TEM linked to a 200 kV ion implanter and a 2×1.7 MV tandem accelerator.Nitrogen ions at 115 keV were successfully transported from the implanter into the TEM chamber through the interface system,and the ion currents measured at the entrance of the TEM column were between 20 and 180 nA.Structural evolution caused by ion irradiation in Si,GaAs,nanocrystal Ag was observed in situ.The in situ observation showed that the critical implantation dose for amorphization of Si is 1014 cm-2.The nuclear material C276 samples implanted with 115 keV Ar+ was also studied,and dislocation loops sized at 3-12 nm were clearly observed after implantation to doses of over 1×1015 cm2.The density of the loops increased with the dose.Evolution to polycrystalline and amorphous structures were observed at 5×l015 cm-2 and 3×1016 cm2,respectively.An in situ RBS/C chamber was installed on the transport line of the accelerator-TEM interface system.This enables in situ measurement of composition and location of the implanted species in lattice of the samples.In addition,a 50 kV low-energy gaseous ion generator was installed close to the TEM chamber,which facilitates in situ TEM observation of helium bubbles formed in helium-implanted materials.

【基金】 国家自然科学基金(10875090)资助
  • 【分类号】O572.211
  • 【被引频次】3
  • 【下载频次】114
节点文献中: 

本文链接的文献网络图示:

本文的引文网络