火力发电厂烟气脱硫性能考核试验
Experiment on Flue Gas Desulfurization (FGD) System of Power Plant
【摘要】 根据《DL/T998-2006石灰石-石膏湿法烟气脱硫装置性能验收试验规范》要求,石灰石-石膏法脱硫系统应在移交生产后6个月内完成性能考核试验,从而对系统的整体性能、主要考核指标进行全面的评价,并发现存在的问题,为运行提供参考。脱硫效率是最主要的考核指标,需根据实际燃用煤种修正后考核。试验证实,该烟气脱硫装置性能基本符合设计要求。
【Abstract】 According to ‘performance test code wet limestone gypsum flue gas desulfurization’,the performance test should be completed within 6 months after the FGD system were put into commercial operation,thus we can conduct a comprehensive assessment of the overall performance of the FGD system and the main evaluation indicators,then found problems and provide a reference for the operation.
- 【文献出处】 电站系统工程 ,Power System Engineering , 编辑部邮箱 ,2010年03期