节点文献

输电线路直流融冰的临界电流和融冰时间分析

Analysis on Critical Current and Ice-melting Time by DC on Transmission Line

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吴端华何东

【Author】 WU Duan-hua,HE Dong(Chengdu Electric Power Bureau Power Dispatching Center,Chengdu 610021,China)

【机构】 成都电业局电力调度中心

【摘要】 国家电网公司和南方电网公司均把直流融冰作为输电线路除冰的重点发展技术。为此,应用传热学的基本原理分析了输电线路直流融冰的热平衡过程,提出了临界融冰电流和融冰时间的计算模型,模型的计算结果得到了试验验证。分析的结果表明,临界融冰电流和融冰时间受环境温度和风速的影响明显,环境温度越低,或者风速越大,均会造成临界融冰电流变大,或者使融冰时间变长。

【Abstract】 State Grid Corporation and Southern Power Grid Company have taken the DC ice-melting as the main method to resist the ice accident on transmission lines.The heat balance of DC ice-melting on transmission lines with heat transfer theory was analyzed,and a calculation model for critical ice-melting current and ice-melting time was proposed in the paper.The analytic results with experiments show that critical ice-melting current and ice-melting time are affected by ambient temperature and wind velocity.The critical ice-melting current gets greater and the ice-melting time gets longer when the ambient temperature is lower or the wind velocity is greater.

  • 【文献出处】 电力系统及其自动化学报 ,Proceedings of the Chinese Society of Universities for Electric Power System and its Automation , 编辑部邮箱 ,2010年05期
  • 【分类号】TM75
  • 【被引频次】32
  • 【下载频次】517
节点文献中: 

本文链接的文献网络图示:

本文的引文网络