宝塔山特长隧道设计
Design of Baotashan Extra-long Tunnel
【摘要】 通过试验的方法确定宝塔山隧道围岩岩石力学指标,采用工程类比法确定围岩复合式衬砌支护设计参数,对隧道防排水设计处理方案以及如何有效地控制施工工期,保证项目顺利完成也进行了阐述,为以后同类型隧道的设计与施工提供指导性依据。
【Abstract】 Mechanic indexes of Baotashan tunnel surrounding rock are defined by experiment,design parameters of support of composite lining are defined by engineering analogy method.Water-proofing treatment schemes is expounded as well as how to control time limit for a project to assure project to successfully be completed, provided reference to analogous tunnel’s design and construction.
【关键词】 特长隧道;
衬砌;
排水处理;
施工工期;
【Key words】 extra-long tunnel; lining; drainage treatment; time limit for a project;
【Key words】 extra-long tunnel; lining; drainage treatment; time limit for a project;
- 【文献出处】 筑路机械与施工机械化 ,Road Machinery & Construction Mechanization , 编辑部邮箱 ,2009年10期
- 【分类号】U452.2
- 【被引频次】2
- 【下载频次】63