【摘要】 小湾电站工程2#山梁位于坝前左岸,其中饮水沟堆积体下部分布于自饮水沟沟心到2#梁山脊一带,前缘高程1160m,上部分分布于龙台路一带的缓坡.拱肩槽的开挖,因其斜切2#梁形成上宽下窄的"倒楔形岩体",其稳定性将关系到饮水沟堆积体的稳定性及大坝的建设与运行.2#山梁的岩体结构特征及其边坡开挖过程中产生的变形破坏现象表明,其变形破坏特点为边坡开挖产生卸荷回弹,岩体应力进行调整,结构面的不利组合使得浅表层强卸荷带岩体产生向临空面的变形破坏,坡体内不存在控制边坡变形的统一的、不利的结构面.在此基础上,运用数值模拟的手段,对2#山梁在开挖及蓄水工况下的稳定性进行了分析,结果表明,开挖边坡在经过初期的调整后,其变形将逐渐趋于收敛稳定,不会进入累进性整体破坏阶段;蓄水工况下,边坡的变形虽然有所增加,但增加幅度不大,在采取适当的措施进行局部变形的控制后,最终仍将趋于收敛稳定.图7,表1,参7.

【Abstract】 2# high rock slope is located in the left band of the dam in Xiaowan Hydropower Project,and the lower reaches of YinShuiGou deposit rock is distributed in YinShui gully center to its chine,the front edge elevation of which is 1160 meters,the upper sectors is distributed in the ramp of the TianTai road. The excavation of the spandrel groove obliquely incises the 2# rock slope,which forms an inverse cuneiform-like rock masses,looking like wide in the upper and narrowin the lower,the stability of which is important to the stability of YinShuiGou deposit rock and the construction and operation of this project. Detailed analyses of the structure character of rock mass and the deformation-failure phenomena during the slope excavation showthat the rock mass near slope rebounds toward the free surface due to the stress relief,which results in the deformation and failure of the strong unloading rock masses under the disadvantageous combination of structural planes;there is no unified-disadvantageous structure planes controlling the slope deformation inside of the slope. Based on this,study on stability of this slope is done by using 3D numerical simulation under the excavation and sluice situation. Results indicate that slope deformation will gradually converge and stabilize after the gorge stress field adjustment. Under the sluice situation,although the displacement value is greater,the deformation will tent to be stable after taking appropriate measures to the local rock masses. 7figs.,1tab.,7refs.

【基金】 国家自然科学基金雅砻江水电开发联合研究基金重点项目(50539050)
  • 【文献出处】 湖南科技大学学报(自然科学版) ,Journal of Hunan University of Science & Technology(Natural Science Edition) , 编辑部邮箱 ,2009年01期
  • 【分类号】TV223
  • 【被引频次】4
  • 【下载频次】206
节点文献中: 

本文链接的文献网络图示:

本文的引文网络