节点文献
医院综合污水处理站改造工程设计
Design of Re-construction for Comprehensive Wastewater Treatment Station of Hospital
【摘要】 根据某医院的扩建规模,对该医院污水处理设施在原有基础上进行改造.结果表明,在处理能力增加到800 m3/d时,改进型DAT-IAT处理系统能够对医院综合污水进行有效处理,同时对污水处理过程产生的废气和污泥进行收集和消毒处理,使各项污染物排放均达到新标准的要求.
【Abstract】 Due to the scale of the hospital achieved after expansion,its wastewater treatment infrastructures has been re-constructed.The result shows that,after the capacity of new infrastructures reaches 800 m3/d,the modified DAT-IAT technology can effectively treat the waste water from the hospital,and do a better collection and disinfection treatment to the waste gas and sludge produced during the process of wastewater treatment.The emission of related pollutant meets the newly published standard.
【关键词】 区分预消毒;
医院综合污水;
改进型DAT-IAT工艺;
【Key words】 predisinfection; hospital comprehensive wastewater; modified DAT-IAT technology;
【Key words】 predisinfection; hospital comprehensive wastewater; modified DAT-IAT technology;
- 【文献出处】 许昌学院学报 ,Journal of Xuchang University , 编辑部邮箱 ,2009年05期
- 【分类号】X799.5
- 【下载频次】113