上海某地铁区间盾构超越施工技术研究

Study on transcending technology of shield tunnel during construction in Shanghai

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 程道虎马月梅屈战辉

【Author】 CHENG Dao-hu1,Ma Yue-mei2,QU Zhan-hui3 (1.The Quality Supervision Station for Caption Construction of Shaanxi Provincial Communication Dept.,Xi′an 710068,China;2.Tongchuan Highway Administration Bureau,Tongchuan,Shaanxi 727031,China;3.Xi′an Highway Institute,Xi′an 710054,China)

【机构】 陕西省交通厅基本建设质量监督站铜川公路管理局西安公路研究所

【摘要】 针对先掘进盾构被后掘进盾构超越的特殊情况,以上海某轨道交通区间推进工程实例为背景,研究盾构超越施工技术在特殊条件下的应用.分析超越期间的地面沉降数据,明确超越施工对土体变形的影响,明确了对相邻盾构和隧道的影响程度,得到了地层的变形规律.

【Abstract】 The mutual influence between parallel shield tunneling during construction stage was introduced.The engineering background is from the project of Shanghai metro line,where the later launching shield transcends the earlier launching shield.The ground settlements during the transcending period was analyzed,the degree and scope of mutual influence are obtained.

  • 【文献出处】 西安工程大学学报 ,Journal of Xi’an Polytechnic University , 编辑部邮箱 ,2009年03期
  • 【分类号】U455.43
  • 【下载频次】40
节点文献中: 

本文链接的文献网络图示:

本文的引文网络