节点文献

常温下大体积梁桥承台的温度监控分析

Analysis of Temperature Monitoring for Massive Concrete in Bridge Pile-cap at Normal Temperature

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘山洪; 黄强; 付祥能; 高丽;

【Author】 LIU Shan-hong1,HUANG Qiang1,FU Xiang-neng2,GAO Li1 (1.School of Civil Engineering,Chongqing Jiaotong University,Chongqing 400074,China;2.Chongqing Bridge Building Limited Liability Company,Chongqing 400060,China)

【机构】 重庆交通大学土木建筑学院; 重庆桥梁工程有限责任公司;

【摘要】 温度监控为桥墩承台大体积混凝土施工方提供了可靠的数据,为防止温度裂缝的出现起到了积极的作用,结合工程实际介绍了大体积混凝土在常温下的温度监控措施,可以作为其它桥墩台大体积混凝土施工提供借鉴。

【Abstract】 Temperature monitoring provides the contractor with reliable data during constructing massive concrete in bridge pile-cap,and plays a positive role in preventing the emergence of temperature cracks.The temperature control measures are introduced for massive concrete with the actual project at normal temperature,and can be referred to the massive concrete in other piers and abutments.

  • 【文献出处】 武汉理工大学学报 ,Journal of Wuhan University of Technology , 编辑部邮箱 ,2009年08期
  • 【分类号】U445.559
  • 【被引频次】2
  • 【下载频次】67
节点文献中: 

本文链接的文献网络图示:

本文的引文网络