节点文献
同时具有学习和恶化效应的单机成组排序问题
Single-machine Group Scheduling Problems with Learning and Deterioration Effect
【摘要】 讨论了一类工件的加工时间具有学习效应且安装时间带有恶化的成组排序问题,目标函数分别为极小化最大完工时间和极小化总完工时间,1|pij=aij-bijt,S=δit,GT|Cmax,1|pij=aij-bijt,S=δit,GT|∑Cij,并分别给出了求最优解的多项式时间算法,其中极小化总完工时间问题是在bij=b,δi=δ的特殊情况下给出的。
【Abstract】 In this paper,we discuss a group scheduling problem with learning effect of processing times and deterioration of setup times,the objectives are to minimize the make-span and total complete time respectively.1|pij=aij-bijt,S=δit,GT|Cmax,1|pij=aij-bijt,S=δit,GT|∑Cij Two polynomial-time algorithms are obtained,in which the algorithm of the total complete time problem is proposed in a special case(bij=b,δi=δ).
【关键词】 成组排序;
加工时间;
最大完工时间;
学习效应;
恶化;
【Key words】 group scheduling; processing time; make-span; learning effect; deterioration;
【Key words】 group scheduling; processing time; make-span; learning effect; deterioration;
- 【文献出处】 苏州科技学院学报(自然科学版) ,Journal of Suzhou University of Science and Technology(Natural Science Edition) , 编辑部邮箱 ,2009年02期
- 【分类号】O223
- 【被引频次】1
- 【下载频次】130