工件间具有串并有向图约束的单机随机排序问题
Single Machine Stochastic Scheduling with Series-parallel Digraph Constraints
【摘要】 研究机器发生随机故障的单机排序问题,其中工件间的优先约束为串并有向图,目标函数为极小化加权完工时间和,证明了此问题多项式时间可解,并给出了多项式时间算法.
【Abstract】 This paper deals with the single machine stochastic breakdowns scheduling problem,where the jobs are related by a series-parallel digraph,and the objective function is to minimize total weighted completion time,it is shown that the problem can be solved in polynomial time,and the polynomial algorithm is also presented.
【关键词】 排序;
单机;
随机故障;
串并有向图;
【Key words】 scheduling; single machine; stochastic breakdowns; series-parallel digraph;