炳灵水电站轴承润滑系统设计选择

An Optimum Design for Lubrication System in a Bearing of Bingling Hydropower station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵有东刘国峰石耀宇

【Author】 Zhao Youdong1,2,Liu Guofeng1,Shi Yaoyu1 (1.HydroChina Xibei Engineering Corporation, Xi′an Shaanxi 710065; 2.Xi′an University of Technology,Xi′an Shaanxi 710048)

【机构】 中国水电顾问集团西北勘测设计研究院西安理工大学

【摘要】 炳灵水电站在国内首创将水库的泄洪溢流明渠修建在厂房顶部的布置方式。电站水轮发电机组轴承设计特点为负荷大、转速低,为低速重载轴承,因而轴承润滑系统的合理设计和布置是机组的安全稳定运行的重要保证。对当前国内大型贯流机组普遍采用的几种润滑方式进行分析,结合炳灵水电站厂房布置的特点,优化设计,选用了适合本电站的轴承润滑方式。

【Abstract】 An optimum design that floodway is built on the top of powerhouse is created in the Bingling hydropower sta- tion .It has 5 sets of 48MW bulb-type unit, with maximum operation 25.7 meter and turbine runner diameter 6.2 meter . Large_load and low_speed is the characteristic of bearing of the Bingling hydropower so that the unit bearing lubrication system design and layout is a key guarantee for the safe and stable operation .This paper analyze the different kinds of bearing lubrication solution normally used for large capacity bulb-type unit. A new suitable bearing lubrication system is accepted according to the powerhouse arrangement.

  • 【分类号】TV734
  • 【下载频次】68
节点文献中: 

本文链接的文献网络图示:

本文的引文网络