节点文献
Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage
【摘要】 During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 months, and studied beam dynamics as well. In this paper, some beam dynamics studies on the storage rings and their preliminary results are given.
【Abstract】 During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 months, and studied beam dynamics as well. In this paper, some beam dynamics studies on the storage rings and their preliminary results are given.
【Key words】 BEPCⅡ; commissioning; beam dynamics; luminosity;
- 【文献出处】 中国物理C ,Chinese Physics C , 编辑部邮箱 ,2009年S2期
- 【分类号】TL594
- 【下载频次】37