核电施工控制测量中数据处理方法的综合应用探讨
Discussion About Multiple Applications on Data Optimistic Process in Nuclear Power Plant′s Construction Surveying Control Network
【摘要】 结合核电建设中测量实际情况,以某核电站边角网实测数据为例,对多种模型下的处理结果进行了比较,指出可以优先选用测边网;强调运用Helmert验后方差估计处理测量数据时,取待定点坐标初值尽可能精确,否则会导致迭代求解失效,得不到最终结果.
【Abstract】 Considering the practical conditions about the application of surveying control network during nuclear power plant(NPP)construction,with the calculation result of a real triangulateration data comes from the control network of one NPP being built,the paper gives supports on why trilateration should be selected firstly;it also shows given accurate initial coordinates of the unknown points are important and necessary,otherwise the equations can′t be iterated continuously and the final result can′t be obtained either.
【关键词】 边角网;
Helmert估计;
经验定权;
核电站;
【Key words】 triangulateration; Helmert estimation; experience weighting; nuclear power plant;
【Key words】 triangulateration; Helmert estimation; experience weighting; nuclear power plant;