节点文献

山西瑞光电厂建设中防治水土流失工程措施的典型设计

Typical Design of Engineering Measure for Soil and Water Conservation in Ruiguang Heat-engine Plant,Shanxi

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 焦一之吴志莲

【Author】 JIAO Yi-zhi1,Wu Zhi-lian2(1.College of Soil and Water Conservation,Beijing Forestry University,Beijing100083,China;2.Water Conservancy Department of Shanxi Province,Taiyuan 030002,China)

【机构】 北京林业大学水土保持学院山西省水利厅

【摘要】 随着电力项目的大力建设,山西省整个区域的生态环境也随之恶化,个别地区引发水土流失.通过对山西瑞光电厂项目建设过程中水土流失现状的了解,在全面勘察和分析的基础上,将该项目划分为四个水土流失防治分区:厂区建设防治区、线性设施防治区、贮灰场防治区和施工临时设施防治区,并就各防治分区做出典型的工程措施设计.

【Abstract】 With the construction of the power system in Shanxi Province,the environment of the whole district is turning for the worse.In some parts it even leads to soil erosion.According to the research on the impact of the project construction for the characteristic of soil erosion in Ruiguang heat-engine plant,Shanxi,forward exhaustive investigating and analyzing,the author divided the projects into four parts: industrial area,linear facilities,coal ash yard and temporary facilities.Then it do the typical design of engineering measure for every part, in order to avoid soil erosion from the projects construction effectively and supply reference for the same kind projects in Shanxi Province.

  • 【文献出处】 晋中学院学报 ,Journal of Jinzhong University , 编辑部邮箱 ,2009年03期
  • 【分类号】S157.1
  • 【下载频次】32
节点文献中: 

本文链接的文献网络图示:

本文的引文网络