节点文献
基于最小生产时间的制造任务分配策略
Allocation strategy for manufacturing task with the minimum makespan
【摘要】 为了满足协作离散制造企业群如何能够以最快的时间来响应市场的需求,在基于协作企业群生产工时能力基础上,提出了核心企业如何制定最小生产时间的任务优化分配策略。该策略既满足了生产订单的交付期要求,又考虑了协作企业的生产费用成本,达到了协作企业群制造任务生产计划进度与生产费用的优化。最后给出一个应用示例,说明了该任务分配策略的合理性和有效性。
【Abstract】 In order to study how to make the fastest response time to meet the needs of the market for discrete manufactures,the manufacturing tasks allocation strategy with minimum makespan is put forward,which is based on the production capacity of collaborative enterprises.This allocation method takes into account both the due-date of the orders and the manufacturing cost of the manufacturing tasks.Finally,the implementation of this method is explained with a simple example,which is used to show the method’s reasonableness and validity.
【关键词】 协作企业;
任务分配策略;
最小生产时间;
【Key words】 collaborative enterprises; allocation strategy for manufacturing tasks; minimum makespan;
【Key words】 collaborative enterprises; allocation strategy for manufacturing tasks; minimum makespan;
【基金】 国家863计划资助项目(2007AA040804)
- 【文献出处】 黑龙江大学自然科学学报 ,Journal of Natural Science of Heilongjiang University , 编辑部邮箱 ,2009年05期
- 【分类号】TP399-C2
- 【被引频次】3
- 【下载频次】163