节点文献

赵固一矿首采面覆岩破坏高度研究

Research on Rock Failure Height of No.1 Firstly Mined Working Face of Zhaogu Coal Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 樊娟汪玉松许芳刘英峰

【Author】 FAN Juan1,2,WANG Yu-song1,XU Fang1,LIU Ying-feng2(1.School of Environmental Science,China University of Geology,Wuhan 430074,Hubei,China;2.Institute of Hydrogeology,Xi’an Branch of China Coal Research Institute,Xi’an710054,Shaanxi,China)

【机构】 中国地质大学环境学院煤炭科学研究总院西安研究院水文所

【摘要】 以赵固一矿首采面二1煤顶板作为研究对象,分别应用公式法和岩石破裂过程分析系统(F-RFPA2D)确定在分层开采条件下首采面敷岩破坏的高度。并结合顶板破裂的模拟演化过程,为以后留设防水煤柱提供有效的技术参数。

【Abstract】 According to the hydro-geological conditions of firstly mined working face of No.1 mining area of Zhaogu 21 coalmine,the formulaic method and the RFPA2D(Rock Failure Process Analysis) is applied to confirm the rock failure height of coal roof under the condition of exploiting in layers and with considering the simulated evolvement process of rock failure,it can provide effective technical parameters for setting the waterproof pillar.

【关键词】 顶板破坏数值模拟
【Key words】 Roof failure and numerical simulation
  • 【分类号】P618.11
  • 【下载频次】161
节点文献中: 

本文链接的文献网络图示:

本文的引文网络