提高电能使用效率的可中断电价与峰谷分时电价的联合优化设计

The Optimal Design of Integrating Interruptible Price With Peak-Valley Time-of-Use Power Price Based on Improving Electricity Efficiency

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 谭忠富谢品杰王绵斌张蓉乞建勋

【Author】 Tan Zhongfu1 Xie Pinjie1 Wang Mianbin1 Zhang Rong2 Qi Jianxun1(1.North China Electric Power University Beijing 102206 China 2.Beijing Jingchuang Xingye Investment Consultants Beijing 100043 China)

【机构】 华北电力大学电力经济研究所北京京创兴业投资顾问有限公司

【摘要】 在发电侧竞价上网的情况下,供电公司通过实行可中断电价可以适当规避购网电价剧烈波动的风险。但我国发电企业并未实施竞价上网,供电公司购网电价由政府制定,相对比较稳定,故实行可中断负荷管理对供电公司缺乏一定的激励机制。本文首先根据估算的用户缺电损失确定可中断电价;随之提出用户可中断电价响应系数的概念,对已确定的可中断电价进行调整;然后根据经济学中供需理论,将可中断电价与峰谷分时电价相结合,在分析供电公司成本和效益基础上,建立联合优化模型,采用分解算法进行求解。算例分析表明,该模型既能使供电公司与用户的利益不受损害,又可解决当前可中断电价缺少激励机制的问题,非常适合我国当前的电价改革模式。

【Abstract】 Power-supplying companies can properly evade the risk resulted from on-grid price fluctuating acutely by actualizing interruptible price,base on biding on the generating side.But our country has not actualized biding and on-grid price has been comparatively stable,so it is lacking of incentive mechanism for power-supplying companies to actualize interruptible price.Firstly,the paper confirms interruptible price according to estimated customer interruption cost.Secondly,it presents the conception of the response coefficient for customer interruptible price and adjusts the confirmed interruptible price.Thirdly,according to the supply-demand theory in economics,the paper integrates the interruptible price with peak-valley time-of-use power price in DSM measures,then constructs united optimal model based on analyzing the cost and benefit of power-supplying companies.The model is solved with decomposed arithmetic.Finally,the simulation analysis of the fact sample shows that the proposed model can not only make power-supply companies and customers nondecreasing,but also solve the problem to the lack of incentive mechanism for actualizing interruptible price.Therefore,the price-united optimal design is fit to electricity reformation mode at present in our country.

【基金】 国家自然科学基金(70571023);国家“新世纪优秀人才”计划(NCET-060208)资助项目
  • 【文献出处】 电工技术学报 ,Transactions of China Electrotechnical Society , 编辑部邮箱 ,2009年05期
  • 【分类号】TM73
  • 【被引频次】48
  • 【下载频次】837
节点文献中: 

本文链接的文献网络图示:

本文的引文网络