节点文献
尾矿库合理防洪警戒水位确定及其应用
Determination and Application of Reasonable Flood Control Warning Stage of Tailing Pond
【摘要】 2006年以来,包钢选矿厂尾矿库长期高水位运行,安全超高不足1m;特别在汛期,对尾矿库安全运行造成很大威胁。所以合理确定汛期尾矿库洪水高度,进而计算出尾矿库警戒水位,有效指导尾矿库安全技术管理。
【Abstract】 The tailing pond of the Ore -dressing Plant of Baotou Steel has been used on high water level since 2006, the safe freeboard is less than one metre.Especially in flood season,it seriously affects safe-running of the tailing pond.So the water height of tailing pond is reasonably decided during the flood season.The warning stage is calculated further to effectively guide the safe technical management.
- 【文献出处】 包钢科技 ,Science & Technology of Baotou Steel(Group) Corporation , 编辑部邮箱 ,2009年S1期
- 【分类号】TD928.8
- 【被引频次】1