节点文献

尾矿库合理防洪警戒水位确定及其应用

Determination and Application of Reasonable Flood Control Warning Stage of Tailing Pond

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 宋素芬孙吉民翟文华

【Author】 SONG Su-fen,SUN Ji-min,ZHAI Wen-hua (Ore-dressing Plant of Steel Union Co.Ltd.of Baotou Steel(Group)Corp.,Baotou 014010,Nei Monggol,China)

【机构】 包钢(集团)公司选矿厂

【摘要】 2006年以来,包钢选矿厂尾矿库长期高水位运行,安全超高不足1m;特别在汛期,对尾矿库安全运行造成很大威胁。所以合理确定汛期尾矿库洪水高度,进而计算出尾矿库警戒水位,有效指导尾矿库安全技术管理。

【Abstract】 The tailing pond of the Ore -dressing Plant of Baotou Steel has been used on high water level since 2006, the safe freeboard is less than one metre.Especially in flood season,it seriously affects safe-running of the tailing pond.So the water height of tailing pond is reasonably decided during the flood season.The warning stage is calculated further to effectively guide the safe technical management.

【关键词】 尾矿库防洪警戒水位
【Key words】 tailing pondflood controlwarning stage
  • 【文献出处】 包钢科技 ,Science & Technology of Baotou Steel(Group) Corporation , 编辑部邮箱 ,2009年S1期
  • 【分类号】TD928.8
  • 【被引频次】1
  • 【下载频次】95
节点文献中: 

本文链接的文献网络图示:

本文的引文网络