同步碎石封层机作业速度
Operating Speed of Synchronous Chip Sealer
【摘要】 基于同步碎石封层机的作业速度对施工质量的重要影响,分析了同步碎石封层机的结构组成和施工过程,对沥青碎石洒(撒)布施工中的洒布量和洒布均匀度、不同布料方向、以及同步施工的时间差等对作业速度的要求分别进行了讨论,综合考虑各种因素对同步碎石封层机工作速度的影响及实际施工经验,得出结论:同步碎石封层机的作业速度一般为3~6 km/h。
【Abstract】 The structure and construction process of synchronous chip sealer are analyzed,and the speed require- ment of spreading amount,uniformity,direction and time difference in the construction of asphalt crushed stone spreading is discussed based on the significant effect of the operating speed on the quality of construction.A conclu- sion is made by summing up all the factors and thinking of practical construction experience,saying that the operating speed of synchronous chip sealer should be between 3 km/h to 6 km/h.
【关键词】 同步碎石封层机;
作业速度;
沥青洒布;
碎石撒布;
【Key words】 synchronous chip sealer; operating speed; asphalt distributing; crushed stone spreading;
【Key words】 synchronous chip sealer; operating speed; asphalt distributing; crushed stone spreading;
- 【文献出处】 筑路机械与施工机械化 ,Road Machinery & Construction Mechanization , 编辑部邮箱 ,2008年05期
- 【分类号】U415.5
- 【被引频次】9