节点文献

Construction Simulation and Real-Time Control for High Arch Dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 钟登华任炳昱吴康新

【Author】 ZHONG Denghua, REN Bingyu, WU Kangxin(School of Civil Engineering, Tianjin University, Tianjin 300072, China)

【机构】 School of Civil Engineering, Tianjin University

【摘要】 A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.

【Abstract】 A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.

【基金】 National Natural Science Foundation of China(No.50539120);National Basic Research Program of China(“973”Program,No. 2007 CB714101);National Science Fund for Distinguished Young Scholars of China(No.50525927);National Natural Science Founda-tion of China(No.50579045)
  • 【文献出处】 Transactions of Tianjin University ,天津大学学报(英文版) , 编辑部邮箱 ,2008年04期
  • 【分类号】TV642.4
  • 【被引频次】16
  • 【下载频次】233
节点文献中: 

本文链接的文献网络图示:

本文的引文网络