节点文献
单戗立堵截流在黄丰水电站施工中的应用
Application of end-tipped closure with single bank to construction of Huangfeng Hydropower Station
【摘要】 以黄丰水电站为例,详细介绍了黄丰水电站截流施工方案、施工过程,说明截流最终落差在3 m左右、龙口流速6~7 m/s左右的截流工程,只要采取可靠技术措施,配备足够的大型施工机械,现场施工组织得力,单戗立堵截流方式是较为经济合适的施工方式。
【Abstract】 Taking the construction of Huangfeng Hydropower Station as a study case,the construction scheme and construction process of the river closure concerned are described herein.It shows that the construction method of end-tipped closure with single bank is a more suitable and economical construction method for the river closure project with the final closuring water head of about 3 m and the flow velocity at closure gap of about 6~7 m/s,so long as reliable technical measures are adopted along with enough large construction equipments and better construction organization in site.
【关键词】 水电工程;
施工截流;
单戗立堵;
黄丰水电站;
【Key words】 hydropower project; construction closure; end-tipped closure with single bank; Huangfeng Hydropower Station;
【Key words】 hydropower project; construction closure; end-tipped closure with single bank; Huangfeng Hydropower Station;
- 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,2008年10期
- 【分类号】TV551.2244
- 【被引频次】1
- 【下载频次】93