节点文献
Construction Process Simulation and Safety Analysis Based on Building Information Model and 4D Technology
【摘要】 Time-dependent structure analysis theory has been proved to be more accurate and reliable compared to commonly used methods during construction. However, so far applications are limited to partial period and part of the structure because of immeasurable artificial intervention. Based on the building informa-tion model (BIM) and four-dimensional (4D) technology, this paper proposes an improves structure analysis method, which can generate structural geometry, resistance model, and loading conditions automatically by a close interlink of the schedule information, architectural model, and material properties. The method was applied to a safety analysis during a continuous and dynamic simulation of the entire construction process. The results show that the organic combination of the BIM, 4D technology, construction simulation, and safety analysis of time-dependent structures is feasible and practical. This research also lays a foundation for further researches on building lifecycle management by combining architectural design, structure analysis, and construction management.
【Abstract】 Time-dependent structure analysis theory has been proved to be more accurate and reliable compared to commonly used methods during construction. However, so far applications are limited to partial period and part of the structure because of immeasurable artificial intervention. Based on the building informa-tion model (BIM) and four-dimensional (4D) technology, this paper proposes an improves structure analysis method, which can generate structural geometry, resistance model, and loading conditions automatically by a close interlink of the schedule information, architectural model, and material properties. The method was applied to a safety analysis during a continuous and dynamic simulation of the entire construction process. The results show that the organic combination of the BIM, 4D technology, construction simulation, and safety analysis of time-dependent structures is feasible and practical. This research also lays a foundation for further researches on building lifecycle management by combining architectural design, structure analysis, and construction management.
【Key words】 building information model (BIM); four-dimensional (4D) technology; structure analysis; construc-tion simulation; industry foundation class;
- 【文献出处】 Tsinghua Science and Technology ,清华大学学报(自然科学版)(英文版) , 编辑部邮箱 ,2008年S1期
- 【分类号】TU17
- 【被引频次】37
- 【下载频次】670