节点文献
西二采区10201工作面上顺槽运输方式的确定
Transportation Method Determination in Upper Gate Road of No.10201 Face
【摘要】 运输方式选择决定工作面掘进速度。开凿0#溜煤眼,不仅缓解采掘关系紧张问题,而且减少运输环节人员,增加经济效益。
【Abstract】 Determination of transportation method decides driving speed.Sinking the No.0 section coal bin,not only alleviates the relation problem between mining and drifting,but also reduces transportation personnel and lifts driving economic benefit.
【关键词】 工作面;
上顺槽;
运输方式;
溜煤眼;
【Key words】 face; upper gate road; transportation method; section coal bin;
【Key words】 face; upper gate road; transportation method; section coal bin;
- 【文献出处】 煤炭技术 ,Coal Technology , 编辑部邮箱 ,2008年01期
- 【分类号】TD823.9
- 【被引频次】1
- 【下载频次】25