节点文献

依托特高压提高湖北电网消纳西南水电能力的探讨

Discussing the Way to Accept Hydroelectric Power from the Southwest of China to Hubei Province

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 奚江惠胡济洲

【Author】 XI Jiang-hui1,HU Ji-zhou2(1.Central China Electric Power Dispatching Center,Wuhan 430077,China;2.Hubei Provincial Electric Power Co.,Wuhan 430077,China)

【机构】 华中电力调度通信中心湖北省电力公司发展策划部

【摘要】 我国西南地区是水电富矿地区。在分析湖北省一次能源状况和中长期用电趋势的基础上,围绕我国西南水电送出规划,对湖北电网消纳西南水电的必要性和可行性进行了分析,提出依托特高压工程提高湖北电网消纳西南水电的方案建议。

【Abstract】 The Southwest of China is famous for resourceful waterpower.The paper analyses the energy sources in Hubei Province and electric power supply in Hubei by 2030.Based on the projects of transferring the hydroelectric power from the Southwest of China,the paper discusses the necessity and feasibility for Hubei to accept hydroelectric power largely from the Southwest of China.Then the paper gives a project for Hubei Province to enhance the ability to accept the hydroelectric power largely from the Southwest.

  • 【文献出处】 华中电力 ,Central China Electric Power , 编辑部邮箱 ,2008年06期
  • 【分类号】F426.61
  • 【被引频次】3
  • 【下载频次】58
节点文献中: 

本文链接的文献网络图示:

本文的引文网络