高赞大桥22~#主墩承台无底套箱的设计与施工

Design and Construction of Bottomless Jackets for No.22 Primary Pier Cap of Gaozan Bridge

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【摘要】 介绍高赞大桥22#承台在采用大尺寸无底套箱施工时,利用钢护筒与混凝土之间的摩阻力克服封底后抽水时产生大浮力的不利因素,顺利完成承台从设计到实施的过程。

【Abstract】 For construction of No.22 pier cap of Gaozan Bridge by means of large-size bottomless jackets,this paper mainly introduces a method which utilizes the friction force between steel liners and concrete to overcome adverse factor,i.e.big buoyancy generated during water pumping after the bottom is closed,and favorably completes the pier cap in the process from design to construction.

【关键词】 无底套箱; 设计; 施工;
【Key words】 bottomless jacket; design; construction;
  • 【文献出处】 公路交通技术 ,Technology of Highway and Transport , 编辑部邮箱 ,2008年02期
  • 【分类号】U445.55
  • 【被引频次】1
  • 【下载频次】22