节点文献
飞来峡水利枢纽土坝混凝土防渗墙局部渗漏分析与处理
Analysis and Treatment of Partial Leakage in the Concrete Impervious Wall on the Earth Dam of Feilaixia Hydraulic Project
【摘要】 针对飞来峡水利枢纽河床段土坝在"067"洪水期间巡视检查时发现的局部渗漏,运用现场监测、电测法检查等手段对其进行原因分析,查找出混凝土防渗墙存在缺陷,经研究采用墙体补强灌浆技术措施对其进行处理,后经检测表明效果良好,从而确保了大坝的安全稳定。
【Abstract】 Leakage in earth dam covering the river bed of Feilaixia hydraulic project is detected in the investigation during the "067" flood.The causes are therefore analyzed by means of site-monitoring and electrometer.Then,disfigurements are found on the concrete impervious wall.To deal with it,the technique of grouting the wall is adopted and test proves that it has a favorable effect.As a result,the security and stability of the dam are ensured.
- 【文献出处】 广东水利电力职业技术学院学报 ,Journal of Guangdong Technical College of Water Resources and Electric Engineering , 编辑部邮箱 ,2008年01期
- 【分类号】TV543.8
- 【被引频次】2
- 【下载频次】72