1000kV特高压油浸电力变压器施工关键技术分析
Crucial Technology Analysis of Construction for 1000 kV UHV Oil-immersed Power Transformer
【摘要】 在500kV油浸电力变压器施工技术和经验的基础上,就1000kV油浸电力变压器现场施工所涉及的绝缘控制、变压器油处理、真空处理、1000kV引线结构及出线系统安装、交接试验等关键技术问题进行分析并提出相应对策。
【Abstract】 Based on the construction technology and experience of 500 kV oil-immersed power transformer,the crucial technologies of construction on-the-spot for 1000 kV oil-immersed power transformer were analyzed such as insulation control,transformer oil handling,vacuum handling the lead structure of 1000 kV and line system installation,hand-over test.And the corresponding countermeasures were put forward.