节点文献

MC条件下两阶段供应商生产计划优化模型研究

Research on Optimal Model for Two-PeriodSupplier Production Planning Based on MC

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 于萍季建华顾巧论

【Author】 YU Ping JI Jian-hua GU Qiao-lun 1.Antai School of Economics & Management,Shanghai Jiaotong University,Shanghai 200052,China

【机构】 上海交通大学安泰经济与管理学院

【摘要】 大规模定制(MC)的成功实施和推广,不仅需要面向大规模定制的技术、管理和市场等方面的支持,而且需要供应链上下游成员的密切配合。以实施大规模定制的制造商为背景,研究其订单分离点产出所拉动的供应商供货计划;运用延迟制造的思想,提出两阶段供应商生产模式;并在同时考虑交货期与成本控制的基础上,建立了第二阶段的主生产计划优化模型,给出了数据实例。

【Abstract】 To implement the mass customization (MC),not only the technology,management and marketing supporting are needed,but also the close cooperation between upper and lower members in supply chain is needed.Based on the manufac- turer who has carried out MC,the supplier’s supply planning driven by the output of CODP was studied,and two-period supplier production mode was proposed by the idea of production postponement.Optimal model of Main Production Planning (MPS) of the second period was established,and a numerical example was shown to prove its optimization.

【基金】 国家自然科学基金项目(70472057)
  • 【文献出处】 重庆交通大学学报(自然科学版) ,Journal of Chongqing Jiaotong University(Natural Science) , 编辑部邮箱 ,2008年04期
  • 【分类号】F274;F224
  • 【被引频次】4
  • 【下载频次】176
节点文献中: 

本文链接的文献网络图示:

本文的引文网络