节点文献

Assessment of dam impacts on river flow regimes and water quality:a case study of the Huai River Basin in P.R.China

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 夏军张永勇

【Author】 XIA Jun 1,2,ZHANG Yong-yong 2,WANG Gang-sheng 1 1 Key Laboratory of Water Cycle and Related Land Surface Processes,the Institute of Geographical Sciences and Natural Resources Research,Chinese Academy of Sciences,Beijing 100101,P.R.China 2 State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan 430072,P.R.China

【机构】 Key Laboratory of Water Cycle and Related Land Surface Processes, the Institute of Geographical Sciences and Natural Resources Research, Chinese Academy of SciencesState Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University

【摘要】 The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water Assessment Tool) model coupled with a water quality-quantity balance model to evaluate dam impacts on river flow regimes and water quality in the middle and upper reaches of the Huai River Basin.We calibrated and validated the SWAT model with data from 29 selected cross-sections in four typical years(1971,1981,1991 and 1999) and used scenario analysis to compensate for the unavailability of historical data regarding uninterrupted river flows before dam and floodgate construction,a problem of prediction for ungauged basins.The results indicate that dam and floodgate operations tended to reduce runoff,decrease peak value and shift peaking time.The contribution of water projects to river water quality deterioration in the concerned river system was between 0 to 40%,while pollutant discharge contributed to 60% to 100% of the water pollution.Pollution control should therefore be the key to the water quality rehabilitation in the Huai River Basin.

【Abstract】 The Huai River Basin is a unique area in P.R.China with the highest densities of population and water projects.It is also subject to the most serious water pollution.We proposed a distributional SWAT(Soil and Water Assessment Tool) model coupled with a water quality-quantity balance model to evaluate dam impacts on river flow regimes and water quality in the middle and upper reaches of the Huai River Basin.We calibrated and validated the SWAT model with data from 29 selected cross-sections in four typical years(1971,1981,1991 and 1999) and used scenario analysis to compensate for the unavailability of historical data regarding uninterrupted river flows before dam and floodgate construction,a problem of prediction for ungauged basins.The results indicate that dam and floodgate operations tended to reduce runoff,decrease peak value and shift peaking time.The contribution of water projects to river water quality deterioration in the concerned river system was between 0 to 40%,while pollutant discharge contributed to 60% to 100% of the water pollution.Pollution control should therefore be the key to the water quality rehabilitation in the Huai River Basin.

【基金】 Funded by the Key Project of International Cooperation of the Natural Science Foundation of China (No. 40721140020);the Key Project of the Natural Science Foundation of China (No. 40730632)
  • 【文献出处】 Journal of Chongqing University(English Edition) ,重庆大学学报(英文版) , 编辑部邮箱 ,2008年04期
  • 【分类号】TV882.3
  • 【被引频次】8
  • 【下载频次】219
节点文献中: 

本文链接的文献网络图示:

本文的引文网络